Technic City Trains

From Pandorabox
Revision as of 06:52, 3 December 2021 by Blockhead (talk | contribs) (A bit more info)
Jump to navigation Jump to search
Services map for passengers
Early proposed services map of TCT which shows the network geographically to scale.

Technic City Trains (TCT) is a railway operator in the greater Technic City area. Its authority is delegated by BuckarooBanzai to Blockhead for the purpose of building railways and stations and operating trains in the area. It operates two lines and will co-operate with PRC to ensure any regional connections.

Services

TCT operates two lines: The U1 metro line and S1 local train.

The U1 line will operate two kinds of services: Clockwise and anticlockwise. The stations (in clockwise order) are so far proposed with the names: Tardis, Workshop, Beach and Excavations. In Stage 2, clockwise services are proposed to stop at a new station at Technic City Harbour, which is between Excavations and Beach. Anticlockwise services will go straight from Excavations to Beach.

The S1 line will operate out of a new third terminal track at Tardis station and have a stop at Brickhouse, and later in Stage 2 at Snowy End.

Right of way

The TCT network constitutes a central ring line around the centre of Technic City and a short local railway line that leaves the city going southwest and then west. It was constructed by BuckarooBanzai possibly with help from others.

The central ring line is entirely elevated, a la the Chicago "L". The viaduct continues southwest out of the city and ends just before Brickhouse Station, then starts again as the terrain falls into the ocean going west. Track spacing varies from 3 to sometimes just 1 node between tracks. In future 3 node spacing should be preferred.

Rolling stock

TCT only has a small roster of rolling stock due to the difficulty of acquisition with complicated recipes. At beginning of operation it has 2 subway wagons, one for each direction on U1, and one 3-car Japanese train for S1.

History

TCT was founded on 23 November 2021 after Blockhead volunteered to operate trains in the area after noticing there was a decent amount of right of way already in place. Authority was quickly given to allow him to work on the railway. The protections were surveyed and major access issues resolved by BuckarooBanzai.

The S1 line was in operation by Friday 26 November but its opening was not announced and signage was not yet complete.

TCT officially opened services on 3 December 2021. Two Subway wagons were provided for U1 by Kermit, and the S1 was already operating with Japanese wagons bought from admin shop. Station signage and a the passenger services map were completed on this date. Mapserver blocks were also added although they look rather rough since the mapserver draws straight lines instead of nice polygons.

Future

TCT does not yet have plans to extend or build new railway lines. There is a hope to extend U1 to Technic City Harbour in future, but this is conditional on permission from Ruggila.

A larger central station for Technic City needs to be planned in order to prepare for an increase in the number of services, whether local or regional and operated by TCT, PRC or others. A site is not yet identified.